engineering


We are not only specialist planners for plant engineering; we have developed many of the processes that represent the current state of the art ourselves - starting with machine-technical details, such as wrap protection for drum screening machines (1988), plant sections (e.g., first plastic types sorting module, 1999) to complete processes (e.g., KAKTUS-SORTEC process or the latest generation of complex lightweight packaging (LVP) large-scale plants). (Almost) nowhere is HTP's name written on any parts, but (almost) everywhere is HTP process technology involved.

 

But not only procedurally do our new designs show our unmistakable signature; we also know the importance of implementation details for a truly successful implementation - especially with the complex raw material “waste”.

 

Since our first plant design in 1993, we have maintained the principle that site planning right up to steel construction is designed by our process engineers. This guarantees the functionality and flexibility with a high degree of operational safety as well as the maintainability of our systems over their entire useful life.

REFERENCES ENGINEERING SERVICES - MSW FACILITIES

overview of RECENT PROJECTS

HVC/SORTIVA - SORTING FACILITY FOR MSW WITH INTEGRATED SORTING OF DRY RECYCLABLES

Critical review of modification concept, new process design and plant layout (detailed 3D layout) with interfaces to incinerator, MRF and digestion.

SORTIVA 2016

CONFIDENTIAL - SORTING FACILITY FOR MSW WITH INTEGRATED SORTING OF DRY RECYCLABLES

Basic engineering, tender procedure and owner's engineering for an MSW and PMD hybrid sorting facility in connection with an EFW facility (out of scope of HTP-services).

INDAVER 2015

TWENCE - SORTING FACILITY FOR MSW WITH INTEGRATED SORTING OF DRY RECYCLABLES

Basic engineering, tender procedure and owner's engineering for an MSW and PMD hybrid sorting facility.

TWENCE B.V. 2015

MBT OMRIN - MBT WITH KFF SEPARATION

Engineering services, basic engineering I and II, for subsequent sorting of dry recyclables of MSW- line into fractions tailored for reprocessors.

OMRIN  2015

MBT OMRIN - MBT WITH KFF SEPARATION

Integration of separation stages for recyclables defined by KFF+ material and additional metal separation stages.

OMRIN 2012/2013

MBT MERTESDORF  - MBT HERHOFF SYSTEM

Integration of new metal separation stages for ferrous metals and non-ferrous metals.

RegAB 2013/2014

GREATER MANCHESTER - LONGLY LANE MBT

MRF/MBT for MHW

Eggersmann- Haase system

Troubleshooting, technical advice for reengineering

Costain 2012/2013

KSC eon - KSC SCHWEDT

Finalisation and reengineering of the RDF plant. EPC project , design review up to take over procedure

Additionally: Planning and supervision of first plant revision.

KSC /eon /EEW 2012

RABA IHLENBERG - MBT

Integration of automatic sorting lines to recover recycling material

- concept to performance test

IAG 2008

MBA LÜBECK - MBT-Haase system

Technical SWOT analysis – optimization concept.

2007 - 2008

MPS REINICKENDORF - MPT

Improvement of process, additional sorting steps: screening, shifting, NIR-sorting - reengineering to construction supervision and optimisation of production.

ALBA 2006 - 2008

MBT MERTESDORF - MBT HERHOFF SYSTEM

Pilot plant to recover recycling material – concept to construction supervision.

RegAb 2008


REFERENCES ENGINEERING SERVICES FOR PMD SORTING PLANTS

OVERVIEW OF RECENT PROJECTS 

KSI HEERENVEEN - KSI/PMD

Basic engineering I and II, tender procedure

Omrin 2016

SITA ÖLBRONN - PMD

Basic engineering I and II, tender procedure

SUEZ 2015

PMD SORTING PLANT ROTTERDAM - PMD

Extension of Sitas sorting plant by additional separation lines -all phases

SITA 2014

PMD SORTING PLANT ANTWERP - PMD

Improvement of process, integration of new NIR-sorters and enhancement of throughput - concept to commissioning test

INDAVER 2013/2014

PMD SORTING PLANT IN NRW - PMD

PMD sorting plant with polymeric separator circuit; capacity 100,000t/a; investment 10 m € (without infrastructures) - all phases

LOBBE 2015

PMD SORTING PLANT ROTTERDAM - PMD

PMD sorting plant with polymeric separator circuit ; investment 7 m € (without infrastructures)

- all phases

SITA 2011

PMD PILOT PLANT - PMD FROM MUNICIPAL WASTE

Critical review of concept, optimisation of pilot plant

OMRIN 2009

SORTING PLANT PETERBOROUGH - MRF / SORTING PLANT FOR MIXED DRY RECYCLABLES

Multifunctional sorting plant with several screening and shifting steps,  NIR-sorters for tetra and plastics - concept and basic engineering

VIRIDOR 2008

PMD SORTING PLANT HAMBURG - PMD

PMD sorting plant with polymeric separator circuit and integrated mixed plastic process; investment 14 m € (without infrastructures) - all phases

VEOLIA 2008

PMD SORTING PLANT SOUTH - PMD

PMD sorting plant with polymeric separator circuit and integrated mixed plastic process; investment 12 m € (without infrastructures) - all phases

VEOLIA 2008

PMD SORTING PLANT PORTA - PMD AND COMMERCIAL WASTE

New development of a sorting plant with polymeric separator circuit, throughput rate >15 t/h - concept to construction supervision

TÖNSMEIER 2006

PMD SORTING PLANT BRAUNSCHWEIG - PMD

PMD sorting plant with polymeric separator circuit and integrated mixed plastic process; investment 12.5 m €  - all phases

ALBA 2006

PMD SORTING PLANT OPPIN -  PMD AND COMMERCIAL WASTE

PMD and commercial waste sorting plant with polymeric separator circuit and integrated mixed plastic process; invest 12.5 m € (without infrastructures) - all phases

TÖNSMEIER 2006

PMD SORTING PLANT BERLIN - PMD

New development of a sorting plant with polymeric separator circuit, throughput rate >15 t/h; investment approx 20 m € - concept to construction supervision

ALBA 2007

PMD SORTING PLANT TRIER - PMD

Improvement and enlargement of existing PMD -Sorting plant capacity 100,000 t/a; investment 5 m €

- all phases

ART 2009


REFERENCES ENGINEERING SERVICES FOR PMD SORTING PLANTS

overview of RECENT PROJECTS

QCP- GELEEN - REPROCESSING FACILITY FOR POST CONSUMER POLYOLEFINS

Owner's engineering during engineering, construction and commissioning stage

QCP 2014/2016

IBA- FACILITY

BAT-research, choice of equipment, testing of new technologies, basic engineering

INDAVER 2015/2016

SYSTEC EISFELD - RECYCLING/REPROCESSING FACILITY FOR POST CONSUMER PLASTIC FILM

Feasibility study and basic design of pre-treatment-process and -plant design

SYSTEC (DSD) 2016

CeDo RECYCLING - RECYCLING/REPROCESSING FACILITY FOR POST CONSUMER PLASTIC FILM AND AGRICULTURAL FILM

Owner's engineering during purchase, erection, commissioning and optimization phase of a dry cleaning and regranulation line for post consumer plastic film

CeDo GELEEN 2013/2014

SYSTEC HÖRSTEL - RECYCLING/REPROCESSING FACILITY FOR POST CONSUMER DENSE PLASTICS PE/PP

Reprocessing plant; washing, grinding density separation and extrusion of post consumer plastics according to spec. 324 and 329 –process and plant optimisation

SYSTEC (DSD)  2011/2012

PAPER SORTING PLANT LEIPZIG - SEPARATELY COLLECTED PAPER 

New development of a sorting plant for separately collected waste paper, including paper spike and NIR-sorters - concept to construction supervision

ALBA 2006

RDF PLANT EICHENZELL - INDUSTRIAL AND COMMERCIAL WASTE

Several separation steps for heavies, metals and fines, three granulators with a capacity of 15 t/h - conception to performance test

SULO 2006/2007

RDF PLANT BERLIN - INDUSTRIAL AND COMMERCIAL WASTE; DEMOLITION DEBRIS

Improvement of plant design and integration of new sorting and grinding steps

- conception to performance test

ALBA 2006

RDF PLANT DORTMUND - INDUSTRIAL AND COMMERCIAL WASTE

New waste treatment process with shifting screening and grinding the RDF to 25 mm

-conception to performance test

DOGA 2006

SORTING PLANT FOR COMMERCIAL WASTE - INDUSTRIAL AND COMMERCIAL WASTE

Several separation steps for heavies, metals and fines, three granulators with a capacity of 15 t/h - conception to construction supervision

CLEANAWAY 2005

ECC - BOCHUM - C&I WASTE, BULKY WASTE, PRODUCTION OF RDF

Waste treatment centre with three lines and a total capacity of 290.000 t/a, new process for bulky refuse with NIR-technology

- conception to performance test

USB 2006

SORTEC - PMD COMMINGLED

Development of a complete new integrated process with pre separation steps, washing and density separation for plastics and regranulation,

Investment 20 m € - process development to operation assistance

DSD / NORIS 2002

RDF PLANT ANTWERP - INDUSTRIAL AND COMMERCIAL WASTE

Reengineering of process with shifting screening and grinding the RDF to 60 mm, integration of pellet presses; capacity 12 t/h -conception to performance test

INDAVER 2004


en