We are not only specialist planners for plant engineering; we have developed many of the processes that represent the current state of the art ourselves - starting with machine-technical details, such as wrap protection for drum screening machines (1988), plant sections (e.g., first plastic types sorting module, 1999) to complete processes (e.g., KAKTUS-SORTEC process or the latest generation of complex lightweight packaging (LVP) large-scale plants). (Almost) nowhere is HTP's name written on any parts, but (almost) everywhere is HTP process technology involved.
But not only procedurally do our new designs show our unmistakable signature; we also know the importance of implementation details for a truly successful implementation - especially with the complex raw material “waste”.
Since our first plant design in 1993, we have maintained the principle that site planning right up to steel construction is designed by our process engineers. This guarantees the functionality and flexibility with a high degree of operational safety as well as the maintainability of our systems over their entire useful life.
HVC/SORTIVA - SORTING FACILITY FOR MSW WITH INTEGRATED SORTING OF DRY RECYCLABLES
Critical review of modification concept, new process design and plant layout (detailed 3D layout) with interfaces to incinerator, MRF and digestion.
SORTIVA 2016
CONFIDENTIAL - SORTING FACILITY FOR MSW WITH INTEGRATED SORTING OF DRY RECYCLABLES
Basic engineering, tender procedure and owner's engineering for an MSW and PMD hybrid sorting facility in connection with an EFW facility (out of scope of HTP-services).
INDAVER 2015
TWENCE - SORTING FACILITY FOR MSW WITH INTEGRATED SORTING OF DRY RECYCLABLES
Basic engineering, tender procedure and owner's engineering for an MSW and PMD hybrid sorting facility.
TWENCE B.V. 2015
MBT OMRIN - MBT WITH KFF SEPARATION
Engineering services, basic engineering I and II, for subsequent sorting of dry recyclables of MSW- line into fractions tailored for reprocessors.
OMRIN 2015
MBT OMRIN - MBT WITH KFF SEPARATION
Integration of separation stages for recyclables defined by KFF+ material and additional metal separation stages.
OMRIN 2012/2013
MBT MERTESDORF - MBT HERHOFF SYSTEM
Integration of new metal separation stages for ferrous metals and non-ferrous metals.
RegAB 2013/2014
GREATER MANCHESTER - LONGLY LANE MBT
MRF/MBT for MHW
Eggersmann- Haase system
Troubleshooting, technical advice for reengineering
Costain 2012/2013
KSC eon - KSC SCHWEDT
Finalisation and reengineering of the RDF plant. EPC project , design review up to take over procedure
Additionally: Planning and supervision of first plant revision.
KSC /eon /EEW 2012
RABA IHLENBERG - MBT
Integration of automatic sorting lines to recover recycling material
- concept to performance test
IAG 2008
MBA LÜBECK - MBT-Haase system
Technical SWOT analysis – optimization concept.
2007 - 2008
MPS REINICKENDORF - MPT
Improvement of process, additional sorting steps: screening, shifting, NIR-sorting - reengineering to construction supervision and optimisation of production.
ALBA 2006 - 2008
MBT MERTESDORF - MBT HERHOFF SYSTEM
Pilot plant to recover recycling material – concept to construction supervision.
RegAb 2008
KSI HEERENVEEN - KSI/PMD
Basic engineering I and II, tender procedure
Omrin 2016
SITA ÖLBRONN - PMD
Basic engineering I and II, tender procedure
SUEZ 2015
PMD SORTING PLANT ROTTERDAM - PMD
Extension of Sitas sorting plant by additional separation lines -all phases
SITA 2014
PMD SORTING PLANT ANTWERP - PMD
Improvement of process, integration of new NIR-sorters and enhancement of throughput - concept to commissioning test
INDAVER 2013/2014
PMD SORTING PLANT IN NRW - PMD
PMD sorting plant with polymeric separator circuit; capacity 100,000t/a; investment 10 m € (without infrastructures) - all phases
LOBBE 2015
PMD SORTING PLANT ROTTERDAM - PMD
PMD sorting plant with polymeric separator circuit ; investment 7 m € (without infrastructures)
- all phases
SITA 2011
PMD PILOT PLANT - PMD FROM MUNICIPAL WASTE
Critical review of concept, optimisation of pilot plant
OMRIN 2009
SORTING PLANT PETERBOROUGH - MRF / SORTING PLANT FOR MIXED DRY RECYCLABLES
Multifunctional sorting plant with several screening and shifting steps, NIR-sorters for tetra and plastics - concept and basic engineering
VIRIDOR 2008
PMD SORTING PLANT HAMBURG - PMD
PMD sorting plant with polymeric separator circuit and integrated mixed plastic process; investment 14 m € (without infrastructures) - all phases
VEOLIA 2008
PMD SORTING PLANT SOUTH - PMD
PMD sorting plant with polymeric separator circuit and integrated mixed plastic process; investment 12 m € (without infrastructures) - all phases
VEOLIA 2008
PMD SORTING PLANT PORTA - PMD AND COMMERCIAL WASTE
New development of a sorting plant with polymeric separator circuit, throughput rate >15 t/h - concept to construction supervision
TÖNSMEIER 2006
PMD SORTING PLANT BRAUNSCHWEIG - PMD
PMD sorting plant with polymeric separator circuit and integrated mixed plastic process; investment 12.5 m € - all phases
ALBA 2006
PMD SORTING PLANT OPPIN - PMD AND COMMERCIAL WASTE
PMD and commercial waste sorting plant with polymeric separator circuit and integrated mixed plastic process; invest 12.5 m € (without infrastructures) - all phases
TÖNSMEIER 2006
PMD SORTING PLANT BERLIN - PMD
New development of a sorting plant with polymeric separator circuit, throughput rate >15 t/h; investment approx 20 m € - concept to construction supervision
ALBA 2007
PMD SORTING PLANT TRIER - PMD
Improvement and enlargement of existing PMD -Sorting plant capacity 100,000 t/a; investment 5 m €
- all phases
ART 2009
QCP- GELEEN - REPROCESSING FACILITY FOR POST CONSUMER POLYOLEFINS
Owner's engineering during engineering, construction and commissioning stage
QCP 2014/2016
IBA- FACILITY
BAT-research, choice of equipment, testing of new technologies, basic engineering
INDAVER 2015/2016
SYSTEC EISFELD - RECYCLING/REPROCESSING FACILITY FOR POST CONSUMER PLASTIC FILM
Feasibility study and basic design of pre-treatment-process and -plant design
SYSTEC (DSD) 2016
CeDo RECYCLING - RECYCLING/REPROCESSING FACILITY FOR POST CONSUMER PLASTIC FILM AND AGRICULTURAL FILM
Owner's engineering during purchase, erection, commissioning and optimization phase of a dry cleaning and regranulation line for post consumer plastic film
CeDo GELEEN 2013/2014
SYSTEC HÖRSTEL - RECYCLING/REPROCESSING FACILITY FOR POST CONSUMER DENSE PLASTICS PE/PP
Reprocessing plant; washing, grinding density separation and extrusion of post consumer plastics according to spec. 324 and 329 –process and plant optimisation
SYSTEC (DSD) 2011/2012
PAPER SORTING PLANT LEIPZIG - SEPARATELY COLLECTED PAPER
New development of a sorting plant for separately collected waste paper, including paper spike and NIR-sorters - concept to construction supervision
ALBA 2006
RDF PLANT EICHENZELL - INDUSTRIAL AND COMMERCIAL WASTE
Several separation steps for heavies, metals and fines, three granulators with a capacity of 15 t/h - conception to performance test
SULO 2006/2007
RDF PLANT BERLIN - INDUSTRIAL AND COMMERCIAL WASTE; DEMOLITION DEBRIS
Improvement of plant design and integration of new sorting and grinding steps
- conception to performance test
ALBA 2006
RDF PLANT DORTMUND - INDUSTRIAL AND COMMERCIAL WASTE
New waste treatment process with shifting screening and grinding the RDF to 25 mm
-conception to performance test
DOGA 2006
SORTING PLANT FOR COMMERCIAL WASTE - INDUSTRIAL AND COMMERCIAL WASTE
Several separation steps for heavies, metals and fines, three granulators with a capacity of 15 t/h - conception to construction supervision
CLEANAWAY 2005
ECC - BOCHUM - C&I WASTE, BULKY WASTE, PRODUCTION OF RDF
Waste treatment centre with three lines and a total capacity of 290.000 t/a, new process for bulky refuse with NIR-technology
- conception to performance test
USB 2006
SORTEC - PMD COMMINGLED
Development of a complete new integrated process with pre separation steps, washing and density separation for plastics and regranulation,
Investment 20 m € - process development to operation assistance
DSD / NORIS 2002
RDF PLANT ANTWERP - INDUSTRIAL AND COMMERCIAL WASTE
Reengineering of process with shifting screening and grinding the RDF to 60 mm, integration of pellet presses; capacity 12 t/h -conception to performance test
INDAVER 2004